Walt — Simple Man Takeaway
An output that will not turn on is usually waiting for permission you have not found yet.
Plain-English Summary
Use this flow when the desired machine action does not occur and the output device is off. First decide whether the logic result is false or the logic result is true but the field load is not energizing.
R.E.A.L. firstRead-only firstCapture before changingReverse-trace failed conditionsTrap intermittent ghosts
First-Check Flow
Field Checks
- OTE/result true or false in RUN mode
- Output module status and channel indicator
- Output voltage at card terminal
- Fuse, supply, common, and interposing relay checked
- Field device coil resistance / load path checked where appropriate
- Safety/permissive/drive-ready chain understood
Watch Out For
- Replacing a solenoid before checking the OTE is false
- Forcing outputs without safe procedure
- Assuming a coil is bad when an interposing relay is open
- Missing commons or blown fuses
- Output card showing true while field load has no return path
- Brief output pulses too fast for a person to see
Reverse-Trace or Ghost Busting™?
when the failure is stable and visible live. Open the PLC program, monitor in RUN mode, chase only failed conditions, find the driving OTE, and repeat failure-to-failure.
when the failure is intermittent, self-clearing, timing-based, or disappears before maintenance sees it. Select the suspect routine from the HMI and let the comparator trap expected-vs-actual mismatch every scan.
Find the failed result. Identify the blocking condition. Reverse-trace only what is failing. If the truth disappears, trap the ghost.
Related Calculators / SWAT Screens
Walt says STOP! - Safety First
Make these checks prior to proceeding.
Do not bypass safety, force outputs, defeat guards, or work live beyond your qualification and site procedure. If motion, stored energy, live electrical exposure, lockout/tagout requirements, or personnel inside guarded areas are involved, stop and follow the required safety process.