A.I.R.O.N. PDCA Managed Flow
PDCA Cycle
Use PDCA when the team needs a teachable, bounded improvement cycle: plan the change, do it safely, check the result, act on what was learned, then repeat or retain.
Managed flow
CI v9 page
Run the cycle without losing the lesson.
PDCA keeps trials small enough to learn from and structured enough to retain when the change works.
1. Plan
Define the problem, target, hypothesis, owner, risk controls, and expected evidence.
Event workspace
Build the PDCA cycle package.
Capture the plan, trial, check data, act decision, next cycle or closeout path, A.I.R.O.N. sustainment routine, V.A.U.L.T. retention, and KPI preview.